2000 San Pablo Tenant Improvements Phase 2 *Updated 12/08/2023*
- Category
Construction
- Due Date/Time
12/21/2023 2:00 PM
- Contact Person
-
Estimated Award Date
12/05/2023
-
Special Notes/ Comments
**See Addendum #2 - Part 1 and Part 2 for Architectual Drawings** - **See Addendum #3, Addendum #3 Drawings, Existing Conditions, ACM (2012) and PB (2013-2019)**
- Links:
- Q&A2 - 12/08/2023
- Addendum #4 (RFI Response Document) - 11/28/2023
- Addendum #3, Addendum #3 Drawings, Existing Conditions, ACM (2012) and PB (2013-2019) - 11/16/2023
- Attendees List (Conference), Presentation, and Attendees List (Pre-bid Walk) - 11/03/2023
Project Related Documents
- Construction Project Bid Specs
-
RFP/Q Addendum
2760_23101115045.12000SPAddendum1.pdf 2760_Addendum_2_Drawings_Part_1-231017_15045.1_2000_San_Pablo_.pdf 2760_Addendum_2_Drawings_Part_2-231017_15045.1_2000_San_Pablo_.pdf 2760_23102615045.12000SPVirtualAttendancesheet.pdf 2760_2310262000SanPabloPresentationAgenda.pdf 2760_23103115045.12000SPPreBidWalkAttendancesheet.pdf 2760_231116#15045SanPabloBiddingCalendarREVC.pdf 2760_231113#15045SanPabloAddenda03Drawings.pdf 2760_DOCUMENT003119EXISTINGCONDITIONSINFORMATION_2000SanPablo_MR.doc 2760_04735_ACM_2012-2023.pdf 2760_04735_Pb_2013-2019.pdf 2760_231121_15045_2000SanPabloRFIResponseDocument.pdf 2760_231206_15045.1_2000SanPabloQA2.pdf